Sep28.2020
High-end quality and delicate life
The drawing of the Beijing Opera House project completed by our company in December 2016 was deepened. The installation of six-layer beams has been completed on site. The construction site of this project is located at No. 115, Dongzhong Street, Dongcheng District, Beijing (in the courtyard of the Ministry of Culture), with a construction land area of ??13,386.248 square meters. The scale of the project is 1201 large-scale theater buildings with a structural design life of 50 years. The theater is about 128 meters long from east to west, and about 64 meters wide from north to south. The planned total construction area of ??the first phase: 40,902 square meters, of which, the above ground construction area: 2,021 square meters, the underground Building area: 20881㎡, 8 floors above ground, 4 floors underground, total building height 47.2 meters (the highest point of the building). The structure is a hybrid frame shear wall. The construction period: Planned start date: December 25, 2015; Planned completion date: December 23, 2018; Total construction period: 1034 days. Quality goal: To ensure that the structure of the Great Wall Cup Jinbei strives for Luban prize.
The difficulty in the deepening design of this project is that the structural form is a hybrid frame shear wall, the structural nodes are complex and diverse, and the rigid steel columns, steel beams and shear walls need to be punched and the holes are dense. The deepening design workload is large and exceeds Imagine!
At the beginning of receiving the project, based on past experience, it was known that the project was very complicated, and great attention was given from the beginning. As it deepened and progressed, the complexity of the project was far beyond imagination;
is mainly reflected in the use of the building function, such as divided into a performance area, arc audience area, lifting stage, scattered boxes, etc.;
There are multiple elevations on the same floor, and no structural node can be copied. Many XSTEEL commands are not available in this project, and due to the application of new technologies and new processes, the construction drawing design is constantly adjusted in the deepening process, and due to the project Particularity, although more manpower is added, the efficiency is not significantly improved, but it increases the risk of errors and deepens the cost.
The particularity of this project: 1. Long experience time, about 8 months of deepening time before and after; 2. Heavy tasks, team members worked overtime continuously from the beginning of the project, often working until around 2 in the morning; 3. Investment in manpower, There are as many as 15 people at the peak; 4. The output is small, the project is complicated, and there is no effort to work; 5. There are many people on business trips, and there are 200 days of business trips.
In spite of the above-mentioned disadvantages, the dedication and cooperation demonstrated by the project members is not easy for the project members to persevere in the past 8 months. This shows that a mature and capable team has been further strengthened, and it is a foundry Brand writes a strong note!
The LOGO of Hangzhou Hanau Architectural Design Co., Ltd. is very dynamic. The thick vertical lines on the upper and lower parts of the outer ring stabilize the center of gravity, but they are not connected together. . The letters H and A in the circle are combined, and are taken from the first letter of Han-Ao Pinyin. H stands for section steel, which means that the company is characterized by different forms of steel structure design, and at the same time it looks like a golden ding. The letter A stands for number one in the West.
Hangzhou Hanau Architectural Design Co., Ltd. is a professional company that provides comprehensive services for architectural design. Its service areas involve architectural design, structural design, engineering production and installation consulting, etc., which feature different forms of steel structure design. After more than 20 years of experience and accumulation of experience, we can better understand the needs of customers and present excellent architectural works. Since our establishment in 2013, our design projects have spread to more than 10 countries and regions, we have completed more than 300 engineering designs and consulting projects, and have established good cooperative relations with many design institutes, architectural design firms, engineering companies and real estate companies . Since 2014, our company has taken advantage of the national Belt and Road background to devote great enthusiasm to domestic and foreign project design work, and has been highly affirmed and recognized by customers and partners with efficient and pragmatic style and service-oriented philosophy. Participate in or independently complete the Sanya Haitang Bay International Shopping Center project, the Reykjavik City Theatre in Iceland, and the Hilton Taiyuan Hotel.
On the morning of the 22nd, the official Weibo of Hangzhou Shangcheng announced that at 5:07 this morning, a fire broke out in Unit 1, Unit 1, Building 2, Blue Qianjiang Apartment, Kunpeng Road, Shangcheng District, Hangzhou. After full rescue by firefighters, the fire was brought under control at 5:54; the fire was extinguished at 6:48. Four people rescued at the scene died after the rescue failed.
Price Your Building
Enter your details below and we will get back to you
with a price estimate for your building
project.
Width
Length
Height
First Name
Last Name
Phone
Company
Industry
Timeframe
Postal
Country
Building Use
Room 1509, building 1, international Ginza, Zhongdong, Jianshe 1st Road, Xiaoshan District, Hangzhou City, Zhejiang Province