lvjian
lvjian
lvjian
Blog
Información detallada sobre el blog

High-end quality and delicate life

Sep28.2020

  High-end quality and delicate life

  The drawing of the Beijing Opera House project completed by our company in December 2016 was deepened. The installation of six-layer beams has been completed on site. The construction site of this project is located at No. 115, Dongzhong Street, Dongcheng District, Beijing (in the courtyard of the Ministry of Culture), with a construction land area of ??13,386.248 square meters. The scale of the project is 1201 large-scale theater buildings with a structural design life of 50 years. The theater is about 128 meters long from east to west, and about 64 meters wide from north to south. The planned total construction area of ??the first phase: 40,902 square meters, of which, the above ground construction area: 2,021 square meters, the underground Building area: 20881㎡, 8 floors above ground, 4 floors underground, total building height 47.2 meters (the highest point of the building). The structure is a hybrid frame shear wall. The construction period: Planned start date: December 25, 2015; Planned completion date: December 23, 2018; Total construction period: 1034 days. Quality goal: To ensure that the structure of the Great Wall Cup Jinbei strives for Luban prize.

steel structure buildings for sale

  The difficulty in the deepening design of this project is that the structural form is a hybrid frame shear wall, the structural nodes are complex and diverse, and the rigid steel columns, steel beams and shear walls need to be punched and the holes are dense. The deepening design workload is large and exceeds Imagine!

  At the beginning of receiving the project, based on past experience, it was known that the project was very complicated, and great attention was given from the beginning. As it deepened and progressed, the complexity of the project was far beyond imagination;

  is mainly reflected in the use of the building function, such as divided into a performance area, arc audience area, lifting stage, scattered boxes, etc.;

  There are multiple elevations on the same floor, and no structural node can be copied. Many XSTEEL commands are not available in this project, and due to the application of new technologies and new processes, the construction drawing design is constantly adjusted in the deepening process, and due to the project Particularity, although more manpower is added, the efficiency is not significantly improved, but it increases the risk of errors and deepens the cost.

  The particularity of this project: 1. Long experience time, about 8 months of deepening time before and after; 2. Heavy tasks, team members worked overtime continuously from the beginning of the project, often working until around 2 in the morning; 3. Investment in manpower, There are as many as 15 people at the peak; 4. The output is small, the project is complicated, and there is no effort to work; 5. There are many people on business trips, and there are 200 days of business trips.

  In spite of the above-mentioned disadvantages, the dedication and cooperation demonstrated by the project members is not easy for the project members to persevere in the past 8 months. This shows that a mature and capable team has been further strengthened, and it is a foundry Brand writes a strong note!

lvjian Llámanos.

Price Your Building

Enter your details below and we will get back to you
with a price estimate for your building project.

x

Width

Length

Height

First Name

Last Name

Email

Phone

Company

Industry

  • Agricultural
  • Aviation
  • Cold Storage
  • Commercial
  • Equestrian
  • Government/Military
  • Grow
  • Industrial
  • Institutional/Church
  • Manufacturing
  • Metal Home
  • Mining
  • Recreational
  • Spirits
  • Storage
  • Structural
  • Warehouse
  • Workshop
  • Other

Timeframe

  • ASAP
  • 1-3 Months
  • 3-6 Months
  • 6-12 Months
  • 12+ Months

Postal

Country

Building Use

GET PRICE
wdh-site
Thank You!

Your information has been sent to us, we will reply you shortly

OK
wdh-site
Bad!

No success, please try again!

Try Again
- Derecho de autor. 17021817-1.
Apoyo técnico: facechloud
Información
Correo electrónico: dleevanon@gmail.com
Añádase:

Xiaoshan Distrito, Hangzhou Ciudad, Provincia de Zhejiang

Teléfono:+86 173 5715 0425
Fax: 0571-82737816
Sitio web:Hanaubuilding.com
Hangzhou hanao Architectural Design Co., Ltd.
Apoyo del maestro Hangzhou