Port: Shanghai, China
Production Capacity: 20000
Payment Terms: L/C, T/T
Material: Steel Structure
Model NO. | ZZ-003 |
ZZ-003 | China |
HS Code | 7214100000 |
Trademark | Hanau |
Payment Terms | L/C, T/T |
Material | Steel Structure |
Customized | ISO, CE |
Customized | Customized |
Usage | Warehouse, Villa, Dormitories, Temporary Offices, Workshop |
Prefabricated steel structure apartment - With my country's continuous emphasis on economic development, green energy-saving and environmentally-friendly buildings have also reached an unprecedented stage of development. This has also driven my country's steel structure workshop construction industry institutions to move forward. Steel structure construction involves many industries and fields. It is a very systematic engineering project. Each prefabricated component has to go through a very precise budget. To reduce the error range, save the project cost and the emergence of a series of problems, what are the precautions for the construction of the steel structure workshop? Let us briefly understand.
1. The construction site must have dedicated full-time personnel responsible for safety work, supervise and manage the site, conduct unified management of construction personnel and site equipment, and have specialized training and certification for special types of work.
2. All personnel on the construction site must wear safety helmets and protective shoes, electricians and welders must wear insulated shoes, and high-altitude workers must wear safety belts.
3. The safety facilities can only be operated by professionals in accordance with the regulations, dismantled, and restored in time after the event, and the safety personnel must conduct a careful inspection; do a good job in safety operations such as fire prevention and electricity prevention, and all work must be carried out in accordance with the regulations operating.
4. The construction precautions of the steel structure workshop also include insisting on holding a safety meeting before the shift, working arrangements and precautions should be handed over and communicated, and safety adherence should be carried out on a regular basis, and try to prevent and control the occurrence of accidents and unsafe factors.
Prefabricated steel structure apartment - This is the end of the construction precautions for the steel structure workshop. It is necessary to start with the preliminary preparations and conduct safety training and technical training according to the requirements of the construction drawings. Only by starting to pay attention to construction safety issues can we completely eliminate the occurrence of safety hazards and reduce the occurrence of production accidents.
Price Your Building
Enter your details below and we will get back to you
with a price estimate for your building
project.
Width
Length
Height
First Name
Last Name
Phone
Company
Industry
Timeframe
Postal
Country
Building Use
Room 1509, building 1, international Ginza, Zhongdong, Jianshe 1st Road, Xiaoshan District, Hangzhou City, Zhejiang Province