  China Steel structure workshop design company - How to do the inspection work? The construction and installation of steel structure, first install the frame, and secondly, the construction quality of the steel structure is also quite tense, second only to construction safety. In order to ensure the safety of the personnel on the construction site and the safety of the equipment during construction and installation, after the completion of the construction, the quality of the equipment guarantees the safety of the equipment users and the safety of the property inside the equipment. Therefore, carelessness and slack in equipment construction should not be allowed.

China Steel structure workshop design company,Steel structure workshop design,Steel structure workshop

  The construction and installation of steel structure projects must first conform to the axis of the concrete foundation and the elevation of the top surface of the foundation. The method of partial lifting is adopted. All the steel columns are hoisted first, and the grouting is corrected and then hoisted once. The multi-layer steel beams are stabilized and adjusted. , And then installed unchanged, hoisting the roof support and purlin system.

  The steel structure construction site hoisting can be divided into two construction units, and each unit will carry out independent construction. One unit accepts a 50-ton crane, which is hoisted from east to west from 8 axles to 1 axle, and the second unit accepts a 50-ton crane. From axis 9 to axis 15, hoisting from west to east.

  Before the steel structure is installed, it must be in line with the positioning axis of the column foot of the civil foundation construction. The anchor bolts are buried to ensure the accurate positioning of the anchor bolts. The anchor bolts are positioned unchanged with the steel template hole sleeve, and repeated reaming is performed to confirm After correctness, the concrete pouring was started.

  The components delivered to the construction site of the steel structure project should be inspected, especially when the components enter the site, a certificate should be issued, and the number and specifications of the composite components should be counted according to the construction drawings, and the components should be moved in the order of installation within the limits of the installation To ensure the convenience of construction.

  China Steel structure workshop design company - Hanau Building Design is a professional design supplier of Steel Structure Workshop, light Steel Villa, Steel Structure, participated in or independently completed the Reykjavik City Theatre, Taiyuan Hilton Hotel, Sanya Haitang Bay International Shopping Center Project, Doha Airport , Louvre tornado roof, Chengda Building, Yanlord Land Plaza, Lhasa New Convention and Exhibition Center Hotel, Shenyang Taoxian Airport peripheral design, Wuyi Hot Spring logo monument, Xiamen T4 terminal, peripheral design, Beijing Benz peripheral There are more than ten domestic and foreign public building steel structure designs, such as protection design and Shenyang BMW outer protection design. The steel structure is not only environmentally friendly, but also much cheaper than ordinary building materials, making it safer and more reliable. If you have any needs in this regard, please call us and serve you wholeheartedly, thank you.

lvjian Contact Us

Price Your Building

Enter your details below and we will get back to you
with a price estimate for your building project.

x

Width

Length

Height

First Name

Last Name

Email

Phone

Company

Industry

  • Agricultural
  • Aviation
  • Cold Storage
  • Commercial
  • Equestrian
  • Government/Military
  • Grow
  • Industrial
  • Institutional/Church
  • Manufacturing
  • Metal Home
  • Mining
  • Recreational
  • Spirits
  • Storage
  • Structural
  • Warehouse
  • Workshop
  • Other

Timeframe

  • ASAP
  • 1-3 Months
  • 3-6 Months
  • 6-12 Months
  • 12+ Months

Postal

Country

Building Use

GET PRICE
wdh-site
Thank You!

Your information has been sent to us, we will reply you shortly

OK
wdh-site
Bad!

No success, please try again!

Try Again
All rights reserved.Z ICP B No. 17021817-1.
Technical support: facecloud
INFORMATION
Email:dleevanon@gmail.com
Add:

Room 1509, building 1, international Ginza, Zhongdong, Jianshe 1st Road, Xiaoshan District, Hangzhou City, Zhejiang Province

TEL:+86 173 5715 0425
FAX: 0571-82737816
WEBSITE: hanaubuilding.com
Hangzhou hanau Architectural Design Co., Ltd
Support By Hangzhou Great Master